{"id":38,"date":"2021-03-02T14:49:00","date_gmt":"2021-03-02T14:49:00","guid":{"rendered":"https:\/\/www.worlifts.co.uk\/rail\/services\/on-site-examination-testing\/"},"modified":"2022-01-26T09:40:10","modified_gmt":"2022-01-26T09:40:10","slug":"on-site-examination-testing","status":"publish","type":"page","link":"https:\/\/www.worlifts.co.uk\/rail\/services\/on-site-examination-testing\/","title":{"rendered":"On-Site Examination and Testing"},"content":{"rendered":"\r\n
Worlifts, we support so you can achieve<\/p>\r\n
With safety being paramount within the industry, this national service enables the client to ensure his equipment is inspected and tested to current statutory regulations and rail industry requirements with minimum disruption and down time.<\/p>\r\n
All our engineers are fully competent and trained to test and repair all leading brands of plant and all equipment used to carry out the test procedures is traceable back to national standards.<\/p>\r\n
Should faults be found during the test process, these can be rectified and minor repairs carried out as a number of common spares and consumables are stocked within the test vehicle.<\/p>\r\n
<\/p>\r\n
All equipment is assessed and a quotation provided free of charge and all repairs are covered by a comprehensive warranty. Specific service and repair packages are available including fixed price schedules which can assist our customers in controlling their long term repair costs. <\/p>\r\n","protected":false},"excerpt":{"rendered":"
Worlifts, we support so you can achieve With safety being paramount within the industry, this national service enables the client to ensure his equipment is inspected and tested to current statutory regulations and rail industry requirements with minimum disruption and down time. All our engineers are fully competent and trained to test and repair all…<\/p>\n","protected":false},"author":1,"featured_media":827,"parent":26,"menu_order":47,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"page_categories":[14],"acf":[],"_links":{"self":[{"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/pages\/38"}],"collection":[{"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/comments?post=38"}],"version-history":[{"count":7,"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/pages\/38\/revisions"}],"predecessor-version":[{"id":1672,"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/pages\/38\/revisions\/1672"}],"up":[{"embeddable":true,"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/pages\/26"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/media\/827"}],"wp:attachment":[{"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/media?parent=38"}],"wp:term":[{"taxonomy":"page_categories","embeddable":true,"href":"https:\/\/www.worlifts.co.uk\/rail\/wp-json\/wp\/v2\/page_categories?post=38"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}